Betekenis van:
fire up
to fire up
Werkwoord
- arouse or excite feelings and passions
Synoniemen
Hyperoniemen
Hyponiemen
to fire up
Werkwoord
Synoniemen
Hyperoniemen
to fire up
Werkwoord
- arouse or excite feelings and passions
Synoniemen
Hyperoniemen
Hyponiemen
to fire up
Werkwoord
- arouse or excite feelings and passions
Synoniemen
Hyperoniemen
Hyponiemen
to fire up
Werkwoord
- arouse or excite feelings and passions
Synoniemen
Hyperoniemen
Hyponiemen
Werkwoord
Voorbeeldzinnen
- The fire burned up brightly.
- Immediately after it caught fire, the chemical factory blew up.
- A fire was seen to blaze up far away.
- The company was really up shit creek when a fire destroyed all their computer discs.
- ‘Look, there, at the large cauldrons, the fire always burns under them. At day and at night I fill them full of people’s tears from this lake and heat them, so that they dry, until I dry the whole lake, until the steam rises up to the sky!..’
- (ij) products put up as charges for fire-extinguishers or put up in fire-extinguishing grenades, of heading 3813; ink removers put up in packings for retail sale, of heading 3824; or
- Absence of an up-to-date muster list, or crew members not aware of their duties in the event of fire or an order to abandon the ship.
- spaces containing small internal combustion engines of power output up to 110 kW driving generators, sprinkler, drencher or fire pumps, bilge pumps, etc.,
- In new class B ships certified to carry up to 250 passengers or fewer, if a fire in any one compartment could put all the pumps out of action, the alternative means of providing water for fire-fighting purposes shall be an independently driven, power-operated emergency fire pump and with its source of power and sea connection located outside the machinery space.
- In new class B ships certified to carry up to 250 passengers or less, if a fire in any one compartment could put all the pumps out of action, the alternative means of providing water for fire-fighting purposes shall be an independently driven, power-operated emergency fire pump and with its source of power and sea connection located outside the machinery space.
- Given the low density of the fire load of the products making up the infrastructure (track and civil engineering works), this requirement concerns only the case of underground facilities receiving passengers in normal service.
- As described in detail in the opening decision [6] Sachsen LB got caught in the maelstrom of the still ongoing US subprime crisis in particular because of one off-balance conduit, Ormond Quay, which was unable to refinance itself and was in need of liquidity of up to EUR 17,1 billion in order to avoid fire sales.
- A clear and detailed description of the accident clarifying the type of accident, e.g. release, fire, explosion, etc. and illustrating the circumstances leading up to it, including general information such as the time of day, the weather, etc. and any other relevant information.
- Security Systems Integration, interconnectivity and interoperability: Activities related to intelligence, information gathering and civil security will enable and/or contribute to the performance of technology required for building up the above listed capabilities, thus focusing on cross-cutting issues such as: enhancing the interoperability and intercommunication of systems, equipment, services and processes, including law enforcement, fire fighting, civil defence and medical information infrastructures, while ensuring their reliability, protection of confidentiality and integrity of information, traceability of all transactions and their processing, etc. Activities will also address standardisation and training matters (including such with respect to cultural, human and organisational interoperability).
- It will be seen from recitals 77 and 78 that the training courses provided for in the notified project are, to a large extent, mandatory aircraft towing and pushback; aircraft de-icing (basic course); aircraft de-icing (refresher course); apron driver licence; airside supervision; fire protection instruction; cargo door operation; first aid; forklift certificate; IATA PK 7/8; ground service equipment; ramp safety; safety instruction; and security awareness. The ULD build-up course is a specific training measure designed for the handling of DHL containers.